(a) Trade in Energy Materials and Products and Energy-Related Equipment between Contracting Parties at least one of which is not a member of the WTO shall be governed, subject to subparagraph (b) and to the exceptions and rules provided for in Annex W, by the provisions of the WTO Agreement, as applied and practised with regard to Energy Materials and Products and Energy-Related Equipment by members of the WTO among themselves, as if all Contracting Parties were members of the WTO.

(b) Such trade of a Contracting Party which is a state that was a constituent part of the former Union of Soviet Socialist Republics may instead be governed, subject to the provisions of Annex TFU, by an agreement between two or more such states, until 1 December 1999 or the admission of that Contracting Party to the WTO, whichever is the earlier.

Notwithstanding the listing of paragraph 6 of article XXIV of the GATT 1994 in Annex W (A)(1)(a)(i), any signatory affected by an increase in customs duties or other charges of any kind imposed on or in connection with importation or exportation referred to in the first sentence of that paragraph, is entitled to seek consultations in the Charter Conference.

(a) Where a provision of [WTO]1 referred to in this paragraph provides for joint action by [Members of the WTO]2, it is intended that the Charter Conference take such action.3

 

1Editor's note: original "GATT 1947 or a Related Instrument", adapted by editors.

2Editor's note: original "parties to the GATT", adapted by editors.

3Editor's note: part (b) of the Understanding became irrelevant following the entry into force of the Amendment to the Trade-Realted Provisions of the Energy Charter Treaty.

On sait depuis longtemps que travailler avec du texte lisible et contenant du sens est source de distractions, et empêche de se concentrer sur la mise en page elle-même. L'avantage du Lorem Ipsum sur un texte générique comme 'Du texte. Du texte. Du texte.' est qu'il possède une distribution de lettres plus ou moins normale, et en tout cas comparable avec celle du français standard. De nombreuses suites logicielles de mise en page ou éditeurs de sites Web ont fait du Lorem Ipsum leur faux texte par défaut, et une recherche pour 'Lorem Ipsum' vous conduira vers de nombreux sites qui n'en sont encore qu'à leur phase de construction. Plusieurs versions sont apparues avec le temps, parfois par accident, souvent intentionnellement (histoire d'y rajouter de petits clins d'oeil, voire des phrases embarassantes).

Cementownia "Nowa Huta" S.A. v. Turkey, ICSID Case No. ARB(AF)/06/2

  • >Claimant : Cementownia "Nowa Huta" S.A.
  • >Nationality : Poland
  • >Respondent : Turkey
  • >Procedural rules applied : ICSID Additional Facility
  • >Chair : Pierre Tercier
  • >Arbitrator appointed by Claimant : Marc Lalonde
  • >Arbitrator appointed by Respondent : Christopher Thomas
  • >Invoked instruments : ECT
  • >Articles mentioned : Article 17 (1)
  • , Article 10 (1)
  • , Article 1 (6)
  • , Article 1 (7)
  • , Article 13
  • , Article 26
  • , Article 44
  • >Breaches alleged :  
  • >Breaches found : No jurisdiction under ECT
  • >Case status : Award rendered
  • >Year of the award or agreement : 2009
  • >Year of registration : 2006

  •                       
  • Flowchart              
  • >Subject matter of the dispute: Claims arising out of the alleged unilateral termination of certain concession agreements, followed by the alleged seizure and expropriation of assets of the two hydroelectric plants in which the claimant had invested without compensation 
  • >Amount claimed: USD 4,648,157,411
  • >Amount awarded: ZERO
  • >Costs of arbitration: USD 400,000
  • >Award legal costs: Respondent was awarded USD 4,904,822.06
  • >Award costs of arbitration: Costs follow the award

 

ARBITRAL DECISION

17 September 2009

Arbitral Award