- >Subject matter of the dispute: Claims arising from the Decision not to award a production concession covering a field located within 12 miles of the coast of Italy, following the re-introduction of a general ban within the 12 mile limit of the coastline
- >Amount claimed: N/A
- >Amount awarded: N/A
- >Costs of arbitration: N/A
- >Award legal costs: N/A
- >Award costs of arbitration: N/A
ARBITRAL DECISION