Energy Charter Treaty

153 Energy Charter Treaty (6) (a) Before suspending such obligations the injured Contracting Party shall inform the non-complying Contracting Party of the nature and level of its proposed suspension. If the non-complying Contracting Party delivers to the Secretary General a written objection to the level of suspension of obligations proposed by the injured Contracting Party, the objection shall be referred to arbitration as provided below. The proposed suspension of obligations shall be stayed until the arbitration has been completed and the determination of the arbitral panel has become final and binding in accordance with subparagraph (e). (b) The Secretary General shall establish an arbitral panel in accordance with sub-paragraphs (2)(d) to (f), which if practicable shall be the same panel which made the ruling or recommendation referred to in sub-paragraph (4)(d), to examine the level of obligations that the injured Contracting Party proposes to suspend. Unless the Charter Conference decides otherwise the rules of procedure for panel proceedings shall be adopted in accordance with sub-paragraph (3)(a). (c) The arbitral panel shall determine whether the level of obligations proposed to be suspended by the injured Contracting Party is excessive in relation to the injury it experienced, and if so, to what extent. It shall not review the nature of the obligations suspended, except insofar as this is inseparable from the determination of the level of suspended obligations. (d) The arbitral panel shall deliver its written determination to the injured and the non-complying Contracting Parties and to the Secretariat within 60 days of the establishment of the panel or within such other period as may be agreed by the injured and the non-complying Contracting Parties. The Secretariat shall present the determination to the Charter Conference at the earliest practicable opportunity, and no later than the meeting of the Charter Conference following receipt of the determination. (e) The determination of the arbitral panel shall become final and binding 30 days after the date of its presentation to the Charter Conference, and any level of suspension of benefits allowed thereby may thereupon be put into effect by the injured Contracting Party in such manner as that Contracting Party considers equivalent in the circumstances, unless prior to the expiration of the 30 days period the Charter Conference decides otherwise.

RkJQdWJsaXNoZXIy ODM0ODQ=